Ag-leader EZ-Guide 500 Variable Rate Getting Started Guide Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Équipement Ag-leader EZ-Guide 500 Variable Rate Getting Started Guide. Ag Leader EZ-Guide 500 Variable Rate Getting Started Guide User Manual [it] Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer

Résumé du contenu

Page 1 - PN 72556−80−ENG

Version 4.00Revision AMarch 2009PN 72556−80−ENG

Page 2 - Table of Contents

Select the prescription file you want to load and press .6. 8

Page 3 - Introduction

EZ−Boom 2010 SystemConnecting the EZ−Boom 2010 SystemConnect the EZ−Boom 2010 system to the EZ−Guide 500 lightbar as shown below.ITEM DESCRIPTION1 EZ−

Page 4 - Initial Setup

ITEM DESCRIPTION1 EZ−Guide 500 lightbar2 Ag 15 antenna3 Antenna cable (PN 50449)4 EZ−Guide 500 power cable (PN 62817)5 To power6 EZ−Boom to EZ−Guide 5

Page 5 - Confirm VRA Upgrade

ITEM DESCRIPTION1The actual current rateNote: If the rate switch position is M (Manual) and the vehicle is not moving, NA is displayed.2Auto/manual sw

Page 6 - Prescriptions

EZ−Boom Flow CalibrationWhen you perform the EZ−Boom 2010 system flow calibration:Enter the Flow Meter Calibration number:1. Do one of the following:2

Page 7 - Loading a Prescription

To manually enter a rate to send to the controller, select Configuration / Application Control / Target Rate .Alternatively, load a prescription so th

Page 8

There are two settings, measured in seconds:Valve On Latency − the time that it takes for the system to begin spraying after you turn it on.Valve Off

Page 9

Hardi 5500 Variable Rate ControllerConnecting a Hardi 5500 ControllerConnect the Hardi 5500 variable rate controller to the EZ−Guide 500 lightbar COM

Page 10

Alternatively, connect the Hardi 5500 variable rate controller to the EZ−Guide 500 lightbar AUX port as shownbelow.ITEM DESCRIPTION1 EZ−Guide 500 ligh

Page 11 - EZ−Boom 2010 System

TO EZ−GUIDE 500PINSTO HARDI PINS2 −−−−−−−−− 33 −−−−−−−−− 25 −−−−−−−−− 5Hardi Controller SetupTo configure the EZ−Guide 500 lightbar to communicate

Page 12 - EZ−Boom Features

Table of ContentsIntroduction...

Page 13

Select Continue and press 5. To configure the number of boom sections and section widths, go to the Application Control / BoomSetup menu.6. Hardi cont

Page 14 - Using the EZ−Boom 2010 System

ITEM DESCRIPTION1The actual current rateNote: Since the Hardi controller does not report the actual applied rate to the EZ−Guide 500lightbar, this ite

Page 15

Alternatively, set the User Mode to Advanced and then select Configuration / Application Control.Using the Hardi ControllerWhen using a Hardi variable

Page 16

To manually enter a rate to send to the controller, select Configuration / Application Control / Target Rate .Note: When sending a target rate to the

Page 17

* Valve Off Latency − the time that it takes for the system to stop spraying after you turn it off.Tip: To calculate the latency values, time your sys

Page 18

Raven Variable Rate ControllerConnecting a Raven ControllerConnect the Raven variable rate controller to the EZ−Guide 500 lightbar COM port as shown b

Page 19 - Hardi Controller Setup

ITEM DESCRIPTION1 EZ−Guide 500 lightbar2 Ag 15 antenna3 Antenna cable (PN 50449)4 EZ−Guide 500 power cable (PN 62817)5 To power6 EZ−Guide 500 AUX port

Page 20

ITEM DESCRIPTION1 EZ−Guide 500 lightbar2 Ag 15 antenna3 Antenna cable (PN 50449)4 EZ−Guide 500 power cable (PN 62817)5 To power6 External interface ca

Page 21

Operational WarningsWhen using the Raven variable rate controller with the EZ−Guide 500 lightbar, note the following:The EZ−Guide 500 lightbar cannot

Page 22 - Using the Hardi Controller

Note: When changing the Controller type, any open field will be closed.Change the Output Port to COM or AUX if required, to match the lightbar port th

Page 23

IntroductionLegal Notices(c) 2009, Trimble Navigation Limited. All rights reserved.Trimble, AgGPS, EZ−Guide, and EZ−Steer are trademarks of Trimble Na

Page 24

Verify that Status displays Connected.3. Note: If Status displays Not Connected, verify that the EZ−Guide 500 to Raven controller cable issecurely con

Page 25 - Connecting a Raven Controller

5The intended target rateNote: If a prescription is loaded, P is displayed to indicate that the prescription rate is being used,rather than the Target

Page 26

Note: To ensure that areas outside the headland, in exclusion zones, or previously sprayed areas aren't sprayed,you will need to manually turn of

Page 27

Rawson Variable Rate ControllerConnecting a Rawson ControllerConnect the Rawson variable rate controller to the EZ−Guide 500 lightbar COM port as show

Page 28 - Raven Controller Setup

ITEM DESCRIPTION1 EZ−Guide 500 lightbar2 Ag 15 antenna3 Antenna cable (PN 50449)4 EZ−Guide 500 power cable (PN 62817)5 To power6 EZ−Guide 500 AUX port

Page 29

ITEM DESCRIPTION1 EZ−Guide 500 lightbar2 Ag 15 antenna3 Antenna cable (PN 50449)4 EZ−Guide 500 power cable (PN 62817)5 To power6 External interface ca

Page 30

EZ−Guide 500 to Rawson controller cable pinoutsThe pinouts for the EZ−Guide 500 to Rawson controller cable (PN 69730) is shown below:TO EZ−GUIDE 500PI

Page 31 - Using the Raven Controller

Note: When changing the Controller type, any open field will be closed.Change the Output Port to COM or AUX if required, to match the lightbar port th

Page 32

Verify that Status displays Connected.3. Note: If Status displays Not Connected, verify that the EZ−Guide 500 to Rawson controller cable issecurely co

Page 33

The intended target rateNote: If a prescription is loaded, P is displayed to indicate that the prescription rate is beingused, rather than the Target

Page 34

Initial SetupVariable Rate Application UpgradeThe Variable Rate Application (VRA) upgrade option is required to:Allow the EZ−Guide 500 lightbar to com

Page 35

To manually enter a rate to send to the controller, select Configuration / Application Control / Target Rate .Note: The Target Rate screen will give t

Page 36 - Rawson Controller Setup

* Valve On Latency − the time that it takes for the system to begin spraying after you turn it on.* Valve Off Latency − the time that it takes for the

Page 37

Select and then press . A screen with an hourglass appears for a few seconds and then thefollowing screen appears:4. Press . The lightbar restar

Page 38

PrescriptionsIntroduction to PrescriptionsThe EZ−Guide 500 lightbar can import variable rate prescription files in Shapefile format. The application r

Page 39 - Using the Rawson Controller

Using your office computer, copy the three Shapefile files (.shp, .dbf, .shx) into the\AgGPS\Prescriptions\ folder on a USB drive.1. Note: The EZ−Guid

Page 40

After the field is selected, the Available Prescriptions List screen appears.To load a prescription:Press or to select the prescription to load.1.

Page 41

Select the icon and press . The Finished With Field? screen appears.1. Select No and then press . The Create New or Select Old Swath screen appe

Commentaires sur ces manuels

Pas de commentaire